Pay in 4 interest-free payments of $6.62 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 21 - Aug 26
Pay in 4 interest-free payments of $6.62 Learn more
Ships within 48 hours · Estimated delivery Aug 21 - Aug 26
When the signal cleared
We have several GWR BR-WR tubular post lower quadrant signals
this instrument is in working order and was recovered from Stratford West signal box
these instruments replaced the standard "Spagnoletti" blocks which had been in service for well over 70 years
England in 1933
RA 7175 MINISTRY OF TRANSPORT RAILWAY ACCIDENT OM 1952 AT HARROW AND WEALDSTONE STATION. ship-zone-c When the signal clearedA Ministry of Transport Railway Accident report which occurred on 8th October 1952 at Harrow and Wealdstone Station in the London Midland Region of British Railways. This as many people was one of if not the worst railway accident post war and this report is a complete account of this accident and is in excellent condition and contains a large track plan. This report is a large document with 37 pages , photographs and 2 large fold out maps.
US$ 19.99
US$ 32.99
US$ 19.99