Pay in 4 interest-free payments of $3.74 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 22 - Aug 27
Pay in 4 interest-free payments of $3.74 Learn more
Ships within 48 hours · Estimated delivery Aug 22 - Aug 27
ID: BIT16697
A six-car train of BRB&L electric coaches runs under wire near Lynn
Nantasket Beach and Plymouth Lines
Streets: Delancy Street
ID: Cambridge Sewer 14-15
Sullivan Square Station Second Level, Charlestown, Massachusetts March 1, 1913 AA (UK) ID: BIT16697Publisher: Railway Journal Type(s): Print, Architectural Drawing ID: 2026042846 Collection: WardMaps LLC Boston in Transit Book Figure 5. 61 A Renovated Second Level, March 1, 1913 A rapid transit train loading platform (top) and streetcar loop (left) were added to the second level of Sullivan Square Terminal in 1912. The loop expedited movement of streetcars through the upper level. Instead of pulling into one of the stub end tracks on the east side